News

WEST FRASER AQUATIC CENTRE OPENS

Tango Management celebrated the grand opening of the new West Fraser Aquatics Centre on Dec. 14, 2017. The project includes a new six lane 25m lap pool tank addition to the facility; a new leisure pool that incorporates a therapeutic area with sprays and bubbles, a lazy river, warm up lanes, massage seats and a new water slide.  The leisure pool will be constructed in the location of the old lap pool tank.  Also included is a twenty-person accessible swirl pool/hot tub; expanded family change rooms; improved male and female change areas; and a new fitness and multi-purpose space above the changing rooms.
Other notable improvements include an upgrade of the mechanical and electrical systems.  A redesign, expansion and resurfacing of the parking lot was also delivered in conjunction with the project.
In collaboration with VDA Architecture, Skyline Engineering, AME Group, AES Engineering and Aplin and Martin we are very proud to have provided Project and Construction Management Services to the Cariboo Regional District for the project and are thrilled with its success and the long term enjoyment it will bring to the residents of Williams Lake.